Englewood Health Family Birth Place

Englewood, New Jersey

A concept supporting quality.

Adapting to change for a better experience.

Through meetings and workshop discussions during Haskell’s women’s services study, our team identified several priorities for the project: increasing size and support space in clinical areas to meet current licensure requirements, separating patient volume, improving aesthetics, expanding services, and converting to all private post-partum patient rooms. In addition, current trends in obstetric care suggest a rise in Cesarean deliveries and inductions, resulting in longer patient recovery and labor rates, both of which directly impact facility size.

Renovation to the two-floor Family Birth Place relocated existing clinical and support services to improve adjacencies and allow for necessary expansion. As part of the process, we developed a schedule for occupancy and a phased renovation approach to maintain operational integrity during the construction process.

Finish upgrades and new millwork added to existing patient rooms, corridors, nurse stations, and support spaces create a welcoming environment for post-partum services. Use of natural wood tones and a calming neutral and blue color palette helps encourage a calm and peaceful environment. Custom designed patient headwalls include concealed medical gases. Rolling side tables increase flexibility.

As developers and owners of healthcare facilities, we rely on Haskell to deliver our projects in a cost-effective manner and on a timely basis. The consistent, high quality of the finished product never lets us down. Haskell has demonstrated that they are a dedicated part of our team."

Michael B. Garrett
Manager of Project Development, Stone Ridge Development, LLC
Interior photo from inside St John Broken Arrow. Wave like structures hang form the ceiling. Frosted glass and metal railing surround the overlook.

As developers and owners of healthcare facilities, we rely on Haskell to deliver our projects in a cost-effective manner and on a timely basis. The consistent, high quality of the finished product never lets us down. Haskell has demonstrated that they are a dedicated part of our team."

Michael B. Garrett
Manager of Project Development, Stone Ridge Development, LLC
Exterior photo of St. John Broken Arrow building

Related News & Insights

Subscribe to News & Insights

#Simulating myriad variables and scenarios virtually allows engineers to make informed decisions on complex system issues before incurring the expense of real-world application. #Simulation #ManufacturingEngineering https://www.haskell.com/insights/simulation-drives-savings-in-design-construction-operation-and-beyond/

© 2022 Haskell. All rights reserved.