Making a major facility upgrade without making waves in production.
Like many line production facilities, this Tennessee manufacturer had for years relied on local water and wells for water to support the production process. At the same time, the facility created wastewater as part of its manufacturing operations. Today the manufacturer of Bush’s Beans has installed a system to reduce the impact on the local water supply by supplementing their non-food contact water source with reuse water from their waste treatment process.
Haskell brought design-build and process expertise to the table.
The joint venture team of Brown and Caldwell–Haskell provided architecture, structural and plumbing engineering services for the new 2.5 mgd reclamation facility, plus key services including construction management, accounting, procurement and contract management. The team collaborated on multiple design alternatives and comprehensive procurement strategies to deliver $10 million in savings to the Client.
Sustainability that furthers operational savings.
With the sustainable upgrade, the facility has ensured compliance with current and future state environmental and conservation requirements while incorporating sustainable practices that reduce long-term operating costs. What was formerly classified as production waste can now be harnessed, cleaned and distributed for use by the very process that creates it.
Related Topics
Talk to a Subject Matter Expert
Project Highlights
2.5 mgd process water reclamation facility
New operations & administration facilities
Biogas refinement & conveyance facilities
Innovative thinking generated $10MM+ in client savings
Sustainable design reduces local water demand
Reclaimed biogas is utilized in boiler operations to reduce operating costs
The planning and coordination of the construction interface between the new WWTP and our operating production facility have been very effective. The BC-Haskell team operates in an open and collaborative environment. Design or field construction challenges are addressed in a direct and objective manner with all parties focused on a common goal of successful project delivery and start-up.
Terry Farris
Director of Engineering, Bush Brothers & Company
Related Projects
Winter Haven, Florida
Winter Haven Wastewater Treatment Plant
St. Marys, Georgia
Point Peter Wastewater Treatment Plant
Lancaster, Texas
Meat Processing Facility & Distribution Center
Related News & Insights
How to Control Glass Hazards in Food Manufacturing
Learn how to reduce glass contamination risks through prevention, inspection and maintenance best practices. Protect food safety and product quality.
AI-Enabled Material Handling Automation in Pet Food Facilities
Learn how engineered material flow and AI-enabled automation can cut manual touches, speed dock-to-truck loading and support scalable growth.
The Real Cost of Moving from Artificial to Natural Flavors and Colors
Regulatory scrutiny and consumer expectations make economic planning essential, not optional. Learn how to build a long-term reformulation roadmap.
What Distilleries Should Know About Industrial Wastewater
See how Haskell experts evaluated distillery wastewater to help spirits manufacturers plan right-sized pretreatment solutions.















