Scripps Radiation Therapy Center

La Jolla, California

Iconic design creates unique outpatient experience.

Scripps Radiation Oncology Center isn’t just another pretty face.

The Radiation Oncology Treatment Center is not just another pretty face. Its three new linear accelerators provide faster, more precise treatments while the CT simulator produces 4-D imagery at of which provides physicians with vital information to develop more accurate and effective treatment plans.

From the moment a patient or family member arrives on-site, holistic design visual cues enable a sense of personal well-being while providing confidence in the level of care and leading edge technology housed inside the building. The design provides a balanced framework for delivery of very personal, high level patient care: High Tech and High Touch.

We are proud to feature one of the world’s most advanced technology centers for treating cancer. Inside this state-of-the-art facility, patients will receive radiation therapy with improved precision and shorter treatment times. Scripps Health is the second hospital in the country to install the TrueBeam STx accelerator. The $4 million machine utilizes 3-D imagery and high-dose, short-exposure radiation to attack tumors with minimal damage to surrounding healthy tissue.

As developers and owners of healthcare facilities, we rely on Haskell to deliver our projects in a cost-effective manner and on a timely basis. The consistent, high quality of the finished product never lets us down. Haskell has demonstrated that they are a dedicated part of our team."

Michael B. Garrett
Manager of Project Development, Stone Ridge Development, LLC
Interior photo from inside St John Broken Arrow. Wave like structures hang form the ceiling. Frosted glass and metal railing surround the overlook.

As developers and owners of healthcare facilities, we rely on Haskell to deliver our projects in a cost-effective manner and on a timely basis. The consistent, high quality of the finished product never lets us down. Haskell has demonstrated that they are a dedicated part of our team."

Michael B. Garrett
Manager of Project Development, Stone Ridge Development, LLC
Exterior photo of St. John Broken Arrow building

Related News & Insights

Subscribe to News & Insights

#Simulating myriad variables and scenarios virtually allows engineers to make informed decisions on complex system issues before incurring the expense of real-world application. #Simulation #ManufacturingEngineering https://www.haskell.com/insights/simulation-drives-savings-in-design-construction-operation-and-beyond/

© 2022 Haskell. All rights reserved.