Turbomeca’s new facility would serve the United States military.
In manufacturing, customer requirements often lead to very tough facility requirements. The Turbomeca TMM Manufacturing Facility, which would produce military helicopter turbine engines, was set to be Paris-based parent company Safran’s first U.S. new construction project. Haskell approached the 42-acre site and project as any other — with an innovative master plan and exceptional teamwork.
One of the project’s main challenges was ensuring temperature and air velocity controls.
The 112,000-square-foot structure used tilt-up construction with a single-ply roof and involved unique provisions. Temperature gradients, humidity and air velocity would be major concerns. The facility would accommodate thermal heat treatment, non-destructive testing, metrology, labs and production. The site was also master-planned for a second manufacturing facility.
Our resources ensured on-time delivery while meeting stringent production criteria.
SAFRAN’s first new construction project in the United States was a great success. The facility’s 92,000 square feet of production and 20,000 square feet of office space were built on tighter than average time frame and, in fact, actually finished earlier than scheduled.
Related Topics
Talk to a Subject Matter Expert
Project Highlights
112,000 SF helicopter turbine manufacturing facility
Installed four production lines and associated utilities
Stringent criteria for temperature gradients and air velocity
Related Projects
Prince George, Virginia
Rolls-Royce Crosspointe Rotatives Facility
Kuala Lumpur, Selangor, Malaysia
Spirit AeroSystems Southeast Asia
ROCHESTER, NEW HAMPSHIRE
Safran Aerospace Composites Facility
Related News & Insights
How Haskell, VIKTOR Partner for Agentic Structural Design Assistance
Learn the results of testing that coordinated validated engineering apps, reducing manual data transfers and preserving engineer review.
Kevin Crump will Bring a Student Focus to Foundation Chair Role
Meet Haskell's Director of Design and Technology Innovation and learn how he will advance scholarships and education programs for future engineers.
Shaping Outcomes in an Uncertain Construction Environment
See how CM/GC delivery brings cost visibility into design. Learn how early collaboration helps align scope, budget and schedule.
Fabrication, Sales and Service Underpin for Eric Jensen’s Leadership
Learn how the Haskell Superintendent's technical depth and people skills make him 'the glue that keeps it all together' on complex projects.