Preventing a water crisis before it has a chance to happen.
JEA, Florida’s largest community-owned utility, had an issue that could one day affect sewer service for more than 55,000 customers — a situation that redundancy could prevent. While a 42-inch sewer force main at the bottom of the St. Johns River showed minimal signs of exposure or damage, it was nearing the end of its service life with no backup if the aging pipe failed or needed repair. JEA selected Haskell to provide design-build services for the design and installation of approximately 4,200 linear feet of 36-inch HDPE sewer force main inside a 42-inch steel casing.
Haskell aligned the complex timeline and construction to limit impact.
The project was staged from the Jacksonville Sports Complex, home of the Jacksonville Jaguars. The brownfield site — a former shipyard and fuel storage facility dating back to the 1920s — was riddled with buried infrastructure, abandoned foundations, pilings, debris and impacted soils. Equally crucial, the site would host more than 80 events for 700,000 patrons during the six-month construction phase, which began after the largest annual outdoor event in Jacksonville and ended before the 2016 NFL preseason began.
Horizontal directional drilling utilized 4,200 linear feet of 42-inch steel casing.
The 13-month project navigated multiple stakeholders and agencies, completed challenging tie-ins and maintained traffic in a busy urban setting. After completion, JEA had two force mains each capable of conveying up to 10 MGD from the south bank of the St. John’s River to the north bank for treatment. Thanks to Haskell’s careful attention to permitting and a fixed price design-build delivery, JEA gained a backup option delivered on time and expected to be in service for at least 40-50 years.
Related Topics
Talk to a Subject Matter Expert
Project Highlights
Design and installation of 4,200 linear feet of 36-inch HDPE sewer force main
Installed by horizontal directional drill under the St. Johns River
Provides critical redundancy for an aging 42-inch sewer force main
Line serves more than 55,000 JEA customers on the south side of the river
Complex timeline – site hosted 80+ events during construction phase
I was provided the opportunity to work with Haskell on a complex and highly visible sewer infrastructure project located downtown. I can’t say enough about the community focus, flexibility and cooperation the Haskell design-build team showed throughout the project. It couldn’t have gone better from a public outreach and community perspective. I look forward to working with Haskell again on another successful project!
Greg Corcoran
Manager, Community Involvement & Project Outreach, JEA
Related Projects
Jacksonville, Florida
JEA Total Water Management Project-River Crossing
St. Petersburg, Florida
Southwest Water Reclamation Facility
Winchester, Virginia
Frederick-Winchester Service Authority Green Energy Facility
Related News & Insights
AquaNereda Brings Process Intensification to Wastewater Facilities
Project use cases show how innovative compact biological treatment systems can help utilities increase capacity, simplify operations and reduce lifecycle costs.
Fabrication, Sales and Service Underpin for Eric Jensen’s Leadership
Learn how the Haskell Superintendent's technical depth and people skills make him 'the glue that keeps it all together' on complex projects.
Haskell Partners with NEFBA to Expand Construction Trade Education
Learn NEFBA's vision for a state-of-the-art home for the next generation of skilled labor. See how Haskell invests in the future construction workforce.
The Fizz Factor: Learn Why CO2 Is Critical in Beverage Processing
Discover the science behind carbonated beverages and how Haskell SME Dwight Garrels helps clients optimize critical components of manufacturing.