Production upgrades expanded ready-to-eat dairy and storage capacity.
Schreiber Foods engaged Haskell to upgrade and expand its production facilities supporting Slice and Shred product lines. Haskell provided engineering and construction services for new and converted spaces designed to meet high-level ready-to-eat dairy requirements.
The program combined a building expansion with upgrades to existing areas.
The project included a 31,000-square-foot building expansion and 77,000 square feet of upgraded space. The upgraded space comprised 45,000 square feet for ready-to-eat dairy production, 16,000 square feet for freezer storage, 12,000 square feet for ambient storage and 4,000 square feet for offices and laboratories. The project also added cold storage and tempering-cooler areas.
Utility improvements supported the additional production capacity.
Haskell expanded the plant refrigeration system and added a 300-horsepower boiler and extended the steam system. The project also added a 250-horsepower air compressor and a dry-powder ingredient delivery system, along with systems to generate and deliver nitrogen and carbon dioxide.
A fast-track schedule advanced construction and occupancy.
Major construction began in February, joint occupancy followed in June and the project was completed in November. The staged approach advanced production and utility improvements within the project’s one-year fast-track schedule.
The completed work modernized production, storage and supporting infrastructure.
The upgrades combined ready-to-eat production space, cold and ambient storage, employee support areas and expanded utilities. The coordinated engineering and construction scope supported Schreiber Foods’ Slice and Shred operations and future plant needs.
Related Topics
Talk to a Subject Matter Expert
Project Highlights
31,000 SF expansion and 77,000 SF upgraded space
45,000 SF ready-to-eat dairy production upgrade
16,000 SF freezer storage
12,000 SF ambient storage
4,000 SF office and laboratory space
Major refrigeration-system expansion
300 HP boiler and expanded steam system
250 HP air compressor
Nitrogen and carbon dioxide generation and delivery
Dry-powder ingredient delivery system
Engineering and construction
Related Projects
Logan, Utah
Schreiber Foods – Project Moranis
Leitchfield, Kentucky
Bel Brands Cheese Processing Facility
Various Locations, Wisconsin
Confidential Artisanal Cheese Client Multi-Site Process and Expansion Program
Related News & Insights
HP Hood: Packaging Line Replacement
One coordinated system in an active dairy facility in Winchester, Virginia.
What Manufacturers Should Know About High-Temperature Heat Pumps
Discover how industrial manufacturers evaluate high-temperature heat pumps as part of an integrated thermal strategy. Learn what early design decisions shape performance and economics.
An Adventure in Nantucket, Restoring Distillery Automation
Learn how Haskell Subject Matter Expert Alan Green brought custom solutions to Triple Eight Distillery to upgrade an overmodified system.
The Immediate Need for CO₂ Refrigeration in Food Processing
Learn how regulatory pressure and performance demands are accelerating the transition to CO₂ refrigeration across food processing facilities.






