HP Hood P10-P11 Project

Batavia, New York

HP Hood expanded aseptic processing and packaging capabilities at its Batavia facility.

HP Hood engaged Haskell to provide comprehensive process and packaging engineering for the P10-P11 project in Batavia, New York. Haskell furnished and installed two aseptic fillers and integrated the supporting utilities, controls and packaging systems to meet HP Hood’s manufacturing and safety standards.

The process scope integrated water treatment, batching and sanitary utilities.

Haskell’s responsibilities included engineering development, equipment procurement and installation of interconnecting utilities. Systems included carbon filtration and reverse osmosis, batching, a cocoa cook process, culinary steam, sterile-water generation, liquid-sugar receiving and storage, cooling and transfer equipment, clean-in-place processes and filler interconnecting piping. Integrated electrical controls coordinated these systems.

A complete conveyor and packaging system supported production flow.

The packaging scope included a depalletizer, air conveyor, filler platform, downstream conveyors, case spiral, leak detection and rejection, accumulation, capping and cap-handling systems. Haskell also integrated cap inspection and rejection, sleeve labeling, a shrink tunnel, barcode scanning, a spray cooler, case packing, case inspection and rejection, case turning and palletizing equipment.

Controls, commissioning and training supported startup.

Process equipment, packaging systems and electrical controls had to operate as a coordinated production line. Haskell integrated the control systems, trained manufacturing staff and supported startup and commissioning. The work also incorporated good manufacturing practices and safety requirements throughout the installed systems.

The project provided an integrated aseptic production solution.

The P10-P11 project combined processing, utilities, filling, packaging and material movement in one coordinated scope. The completed systems supported automated production flow, sanitary operation and HP Hood’s manufacturing requirements at the 363,000-square-foot facility.

Related Topics

Talk to a Subject Matter Expert

Juan Carlos Salom

Vice President & Division Leader – Dairy

contact Juan Carlos

Project Highlights

363,000 SF

Two aseptic fillers

Advanced batching and mixing systems

Carbon filtration and reverse osmosis

Sterile-water and culinary-steam generation

Clean-in-place systems

Fully automated packaging and conveyor line

Integrated process and electrical controls

Equipment procurement and installation

Startup and commissioning

Manufacturing training

GMP and safety compliance