A greenfield manufacturing campus brought cheese and whey operations together at scale.
Hilmar Cheese Company engaged Haskell to design and construct a new manufacturing campus in Dodge City, Kansas. Haskell delivered an engineering, procurement and construction scope for a 450,000-square-foot facility on a 144-acre site.
The facility was designed for high-volume milk, cheese and whey production.
The campus was purpose-built to process 8 million pounds of raw milk daily and produce more than 300 million pounds of cheese annually. The program included milk receiving and bulk storage, cheese make rooms, whey separation, a spray dryer, cheese and powder packaging, cold and ambient warehousing, quality-assurance laboratories, utility rooms and employee support areas.
Integrated design coordinated process, packaging and building systems.
Haskell combined site and civil engineering, process and packaging engineering, automation and controls, architectural and structural design, MEP systems, refrigeration and wastewater pretreatment. The team developed equipment specifications, process and instrumentation diagrams, clean-in-place circuits, utility loads and control-system architecture as one coordinated package.
Coordinated decisions addressed interdependent systems.
The scale of the campus required process, automation and packaging decisions to stay aligned with cost and schedule. Haskell coordinated equipment relationships and vendor requirements across the facility’s interconnected systems.
The campus was planned for future line additions.
The facility layout and infrastructure were designed to accommodate future process and packaging lines. The resulting campus integrated production, warehousing and distribution functions while preserving flexibility for expansion.
Related Topics
Talk to a Subject Matter Expert
Project Highlights
450,000-SF facility on 144 acres
8 million pounds of raw milk processed daily
More than 300 million pounds of cheese produced annually
Cheese make and whey processing
Whey spray dryer and powder packaging
Cold storage and ambient warehouse
Integrated distribution
Scalable for future line additions
Full-service EPC delivery
Automation, controls, MEP and refrigeration
Wastewater pretreatment
Related Projects
Leitchfield, Kentucky
Bel Brands Cheese Processing Facility
Various Locations, Wisconsin
Confidential Artisanal Cheese Client Multi-Site Process and Expansion Program
Logan, Utah
Schreiber Foods – Project Moranis
Related News & Insights
Make Effective Plant Decisions with AI and Human Expertise
AI recommendations depend on reliable data and operational expertise. Learn what to evaluate before committing time and capital.
HP Hood: Packaging Line Replacement
One coordinated system in an active dairy facility in Winchester, Virginia.
How Haskell, VIKTOR Partner for Agentic Structural Design Assistance
Learn the results of testing that coordinated validated engineering apps, reducing manual data transfers and preserving engineer review.
What Manufacturers Should Know About High-Temperature Heat Pumps
Discover how industrial manufacturers evaluate high-temperature heat pumps as part of an integrated thermal strategy. Learn what early design decisions shape performance and economics.






