Piedmont Athens Regional Hospital Operating Room & HVAC Upgrades

Athens, Georgia

We helped apply a modernization strategy that enhances surgical capacity and infrastructure.

Haskell is leading the renovation of 3,515 square feet within the hospital’s existing OR suite to create three new Operating Rooms, while simultaneously upgrading mechanical systems and lighting across the remaining 29,000 square feet of the suite. This comprehensive effort will modernize surgical environments, increase operational efficiency and strengthen critical building systems—all while maintaining stringent healthcare safety standards and regulatory compliance. The project represents a strategic investment in expanding procedural capabilities and improving the resiliency of essential surgical infrastructure.

Targeted renovations create advanced surgical environments and improve workflow.

The renovation reconfigures underutilized and outdated spaces to support next-generation surgical needs. The existing UGA room will be repurposed as a new OR Storage area, requiring a relocation of the red-line entry point and adjustments to two smoke compartments as part of the enabling work. In addition, the existing On-Call Suite and OR storage zone will be transformed into three state-of-the-art Operating Rooms: two versatile ORs equipped for robotic and laser procedures and one Hybrid OR capable of supporting advanced imaging and complex, multidisciplinary surgeries. These improvements optimize space utilization while enhancing clinical flexibility and staff efficiency.

Infrastructure upgrades prepare the OR suite for long-term performance and adaptability.

Mechanical modernization forms the backbone of the project. All air handling units, rooftop units and chillers serving the OR suite will be replaced and consolidated into a new, properly sized system to improve performance and reliability. Five new rooftop units will be installed on structural steel dunnage tied into existing columns, while ceilings in all seventeen existing ORs will be demolished to allow for ductwork and piping replacement. After construction, ceiling mounted equipment and fixtures will be reinstalled, and all ORs will receive new flooring, wall, and ceiling finishes. The entire department will also transition to energy efficient LED lighting, with fixtures selected to match existing sizes and layouts to preserve lighting continuity. Collectively, these upgrades deliver a high performance, future ready surgical platform designed to meet current demands while supporting long-term growth.

Talk to a Subject Matter Expert

Bryan Smith, PE

Division Leader - Healthcare Design

contact Bryan

Project Highlights

3 New Ors

14 renovated Ors

OR Storage room

HVAC system replacement & consolidation

Utility replacement

Lighting Upgrades

RTU/AHU rooftop replacement

Related Projects

Related News & Insights