High-stakes expansion: We integrated advanced cleanroom capabilities for a state-of-the-art facility.
Airbus U.S. Space & Defense is at the forefront of the commercial space revolution, manufacturing satellites at its final assembly line in Merritt Island, Florida, located within the Space Coast’s Exploration Park. To support this high-volume, mission-critical satellite production, Haskell was selected to deliver a substantial expansion and renovation project, ensuring the facility meets the most rigorous standards for security, precision and efficiency required for the future of U.S. space development.
Airbus needed business continuity and precision environments for satellite manufacturing.
Haskell delivered a 56,000-square-foot expansion and a comprehensive 30,000-square-foot renovation of the facility. At the core of the expansion are three new specialized SCIF/ISO 8 cleanroom spaces, one of which is a dedicated environmental lab. These rooms, along with their supporting infrastructure, including airlocks, gowning areas, secure data centers, storage and utility rooms, were built to the highest standards of precision and security necessary for integrating and testing the satellite platforms.
A paramount challenge was ensuring the integrity of the existing cleanroom throughout the construction. The project’s success was a testament to the design and construction teams’ collaboration and synergy. They devised a non-disruptive, detailed, multi-phase build plan that allowed the existing facility to remain fully operational throughout.
This complex undertaking, executed under an accelerated 6×10 work schedule, again demonstrates Haskell’s track record for successfully handling highly complex, mission-critical construction required by industry leaders like Airbus to deliver on their ambitious goals.
Related Topics
Talk to a Subject Matter Expert
Project Highlights
ISO 8 Cleanroom spaces
35,000 SF of SCIF/ICD-705/TEMPEST areas
56,000 SF expansion
30,000 SF renovation
250,000+ construction manhours over 17 months
Fast-track, accelerated schedule
Haskell Steel
Assist with Owner Equipment/layout
LN2/GN2 Environment Lab
3 cranes with 50-ton hoisting capacity
Walkable ceilings
Roll-up doors throughout the facility to allow satellite movement between rooms
Related Projects
Merritt Island, Florida
Blue Origin Orbital Launch System Manufacturing Facility
Aguadilla, Puerto Rico
Lufthansa Technik Heavy Maintenance Facility
Camp Lejeune, North Carolina
MV-22 Hangar Marine Corps Air Station New River
Related News & Insights
Integrating Landscape Architecture Improves Experience and Performance
Learn how Landscape Architecture aligns scope, budget and design intent, supporting permitting and reducing risk. Design solutions for long-term value.
Data-Based Analysis Drives Optimal Manufacturing Facility Design
Learn how Haskell’s System Analytics team replaces assumptions with facts for smarter capital investment, better performance and reduced risk.
The Immediate Need for CO₂ Refrigeration in Food Processing
Learn how regulatory pressure and performance demands are accelerating the transition to CO₂ refrigeration across food processing facilities.
Designing Cold Chain Systems That Protect Protein Operations
See how engineered cooling strategies support compliance, yield and energy efficiency across pork and poultry processing facilities.