- Locations
- Locations
- United States
- International
United StatesInternationalLatin America Region
- Careers
- Contact Us
We provide fully integrated facility solutions that ensure the execution of capital projects across markets, offering local presence and global reach to the private and public sectors.
With broad-based expertise across disciplines, we are an unparalleled source for performance-driven facilities built to deliver, from concept to ribbon-cutting.
With a broad range of in-house engineering expertise, we can optimize your current operations or take your new project from concept to completion, providing unrivaled service and results.
Haskell is a global network of experts providing integrated design, engineering, construction and professional services to clients and communities.
Built in 1953, the City Creek Water Treatment Plant (CCWTP) in Salt Lake City has reached the end of its useful life. To address the facility’s age, Haskell is executing a full-scale upgrade, replacing critical infrastructure with state-of-the-art systems designed to handle 16 million gallons per day (MGD) of water. The new conventional water treatment plant will include modernized filtration systems, flocculation, high-rate sedimentation plate settlers, backwash capabilities, and a new clearwell. This project is being executed under the Construction Manager/General Contractor (CM/GC) collaborative delivery model with a $140 million budget allocated for the complete project.
Haskell’s early involvement through the preconstruction phase uncovered significant opportunities to enhance efficiency. Our team identified logistical challenges during initial planning that could have resulted in cost overruns. By implementing advanced value engineering methods, we optimized constructability and minimized disruptions. One vital effort involved condensing the new treatment facilities into a single structure, optimizing plant operations and providing a better final design. Additionally, the rerouting of utilities within the plant was defined to maintain plant operations and ensure consistent water treatment during construction.
The plant’s remote location in a steep canyon with an advancing elevation greater than 2,000 feet presents unique challenges. The narrow, single-lane access road is shared with recreational traffic and is prone to heavy snowfall during winter months. Haskell adapted by placing jobsite trailers and staging areas 1.5 miles down the canyon. Additionally, our team developed cost-effective solutions that maintained plant operations throughout the project, ensuring safety and compliance with environmental regulations.
As part of Salt Lake City’s broader effort to mitigate risks posed by natural disasters, the upgraded CCWTP is designed to withstand extreme events. The facility is engineered to return to service immediately after a 2,475-year earthquake, a 100-year wind event or a 500-year flood. This disaster-hardened approach ensures the security of the city’s water supply and was critical in earning the City a FEMA Building Resilient Infrastructure in our Communities (BRIC) grant to help fund the project’s construction.
Throughout the project, Haskell is focused on integrating energy-efficient components that align with Salt Lake City’s sustainability goals. The upgraded plant will feature cutting-edge water treatment technologies that reduce energy consumption while improving operational performance. Also, Haskell is committed to minimizing the project’s environmental footprint through effective waste management, with over 90% of construction waste diverted from landfills. These are essential factors in the new facility achieving an ENVISION Gold Certification.
Which do you prefer: spring or purified water? Maybe it’s mineral? Or perhaps you prefer to skip the bottled stuff and drink...
Editor’s note: Haskell’s Bryan Bedell, Vice President of Water, and Mike Hoisington, Director of Project Development...
One seemingly simple concept – processing clean water and wastewater appropriately – has complicated implications for...
The Salt Lake City Department of Public Utilities (SLCDPU) has partnered with Haskell to construct a state-of-the-art...
Assailed by the widespread effects of climate crisis, increasing demand and aging infrastructure, the stress on – and...
Water is one of Haskell’s core markets, and the growing need for infrastructure in both the public and private sectors has...
Here are three clear reasons why there has never been a better time to be a business development professional in Haskellâ€...
Regional clients, business leaders and industry professionals recently joined Haskell team members to commemorate...
Haskell is increasing its investment in Miami with the opening of a new, larger office to support rapid growth. South Florida’s...
Haskell Project Superintendent Karl Kerr likes to take a vacation after finishing a project and before starting a new one....
Working with family day in and day out may not be for everyone, but it’s never a problem for Exiquio Garcia and his sons Gustavo...
Haskell’s Water and Wastewater Division is growing in both the size and number of projects, so the company now has created...
As job descriptions go, the posting for Haskell’s Director of Project Development in the Water/Wastewater Division describes...
As she talks about the opening in Haskell’s Salt Lake City, Utah, office for a Marketing and Proposal Specialist, Judy Deshler...
Here are some fun Frankie McGee facts. Frankie was a 15-year-old grocery store bag boy when he met his future wife, Ann. She...
As a nationally respected and highly ranked contractor in the Food & Beverage and Water/Wastewater markets, Haskell...
During one of Bobby Bradley’s first days as a carpenter apprentice at Haskell, his superintendent sat him down and asked...
Engineering News-Record’s awards and lists are the gold standard in the construction industry, and as Editor-in-Chief...
These days, Sonny Carter is an experienced and accomplished project superintendent with Haskell, responsible for planning...
Tiffany Shaw grew up loving to build and fix things with her father. She never knew this love for problem solving would lead...
Fresh out of the University of Alabama with a degree in civil engineering, Brad Meadows spent the first three years of his...
JACKSONVILLE, FL – Richard Moore, Director of Construction for Haskell’s Infrastructure & Transportation...
JACKSONVILLE, FL – Haskell, one of the leading global architecture, engineering, construction (AEC) and consulting...
Owners often look to design-build delivery as a means to accelerate the overall schedule for their water or wastewater...
JACKSONVILLE, FL – Haskell, one of the industry’s leading integrated AEC firms, recently took home two Excellence...
What if the owners of municipalities could simultaneously help the environment and create a revenue stream that could...
Bryan Bedell, Division Leader of Haskell’s Water Division, takes a moment to answer five questions about key issues...
What happens when you attempt an infrastructure improvement project without full plans and specifications? For progressive...
Is it possible to make energy upgrades to your facility without being hampered by the inability to raise rates or undertake...
The Miami-Dade Commission approved $1.6 billion over the next 15 years to repair and update the county’s aging water and...
Water utilities have quickly realized the pressures of delivering quality product to consumers in a changing environment....
Although JEA had developed a preliminary design as part of the original request for proposal, they saw value in allowing...
111 Riverside Avenue
Jacksonville, FL 32202
© 2025 Haskell. All rights reserved.
We collect basic analytics to improve your experience. No personal data is stored. By continuing to use this site, you acknowledge this. For more details, see our Privacy Policy.