New Mount Pleasant Hospital

Mount Pleasant, South Carolina

Utilizing manufactured components to minimize costs.

Planning systems today for the growth of tomorrow.

Development of the new 85-bed Mount Pleasant Hospital required thoughtful engineering planning to meet initial needs while considering future campus expansion. The MEP systems include a pre-manufactured rooftop central energy plant and three air handling units. The CEP houses boilers, chillers, heat recovery chiller, pumps, and associated equipment. The heat recovery chiller was designed to re-claim the heat generated by the chiller to pre-heat domestic water and building heating water for re-heat coils in the terminal boxes. Condensate from cooling coils is piped to the cooling tower as part of the make-up water system.

The rooftop air handling units were custom designed units with redundant supply air fans. The main electrical switchgear room is located in the Central Electrical Building on campus remote from the hospital. The building houses double ended 480v dual 4000A MCB switchgear, 6000A paralleling switchgear, 10 ATS’s, 2-1500kW generators and a prepared bay for a third generator. The hospital has 100% emergency power to all critical care areas.

Related Projects

As developers and owners of healthcare facilities, we rely on Haskell to deliver our projects in a cost-effective manner and on a timely basis. The consistent, high quality of the finished product never lets us down. Haskell has demonstrated that they are a dedicated part of our team."

Michael B. Garrett
Manager of Project Development, Stone Ridge Development, LLC
Interior photo from inside St John Broken Arrow. Wave like structures hang form the ceiling. Frosted glass and metal railing surround the overlook.

As developers and owners of healthcare facilities, we rely on Haskell to deliver our projects in a cost-effective manner and on a timely basis. The consistent, high quality of the finished product never lets us down. Haskell has demonstrated that they are a dedicated part of our team."

Michael B. Garrett
Manager of Project Development, Stone Ridge Development, LLC
Exterior photo of St. John Broken Arrow building

Related News & Insights

Subscribe to News & Insights

Infrastructure impacts everything from the economy to the environment. NCL’s Cruise Terminal B redefines Miami’s skyline & nurtures community opportunities. Haskell is helping shape the future of infrastructure. https://www.haskell.com/projects/norwegian-cruise-lines-cruise-terminal-b/ @United4Infra #LeadWithInfrastructure

© 2022 Haskell. All rights reserved.