- Locations
- Locations
- United States
- International
United StatesInternationalLatin America Region
- Careers
- Contact Us
We provide fully integrated facility solutions that ensure the execution of capital projects across markets, offering local presence and global reach to the private and public sectors.
With broad-based expertise across disciplines, we are an unparalleled source for performance-driven facilities built to deliver, from concept to ribbon-cutting.
With a broad range of in-house engineering expertise, we can optimize your current operations or take your new project from concept to completion, providing unrivaled service and results.
Haskell is a global network of experts providing integrated design, engineering, construction and professional services to clients and communities.
The Fort Pierce Utilities Authority (FPUA) initiated a progressive design-build project to relocate the Island Water Reclamation Facility (IWRF) to a newly developed 20-acre greenfield site on the mainland. This $139.5 million project will deliver an 8-million-gallon-per-day (MGD) wastewater treatment facility with the capability to expand to 10 MGD. The new facility will serve the growing population of Fort Pierce, Florida, while enhancing water treatment efficiency, sustainability and resilience.Â
Haskell, in a joint venture with Globaltech, was chosen to provide design and construction services for this significant relocation. The design of the new Mainland WRF includes several advanced features: influent flow equalization, a pretreatment facility with screening and grit removal, an aerobic granular sludge (AGS) biological treatment system, a return and waste sludge pumping station, tertiary filtration, high-level disinfection systems and reject storage. In addition, deep injection wells and aerated sludge storage systems are being incorporated for residuals management, alongside reclaimed water storage and pumping stations to support water reuse initiatives. The project also involves the construction of key buildings, such as a 25,000 SF operations building, a maintenance facility, a blower building and a main electrical service building equipped with an emergency standby power system.Â
The new WRF is designed to accommodate state-of-the-art technologies, including the AquaNereda® biological treatment system and SCADA systems for enhanced operational control and monitoring. AquaNereda® uses aerobic granular sludge (AGS) to treat wastewater more efficiently in a single-tank process, where naturally forming microbial granules break down pollutants. This advanced system reduces the treatment facility’s footprint by up to 75% and energy use by up to 50% compared to conventional systems. Notably, it is also the largest AquaNereda facility currently under construction.  Â
This infrastructure will ensure efficient wastewater treatment, incorporating a range of components such as effluent filters, chlorine contact basins and sludge handling facilities. The project also features significant site development for facility resiliency in tropical events.Â
This project not only meets Fort Pierce’s current wastewater treatment needs but also positions the city for future growth by enabling future capacity expansion. With an expandable capacity from 8 MGD to 10 MGD and built-in reclaimed water storage, the new WRF will support the community’s long-term water management goals while incorporating sustainable and energy-efficient technologies.Â
Which do you prefer: spring or purified water? Maybe it’s mineral? Or perhaps you prefer to skip the bottled stuff and drink...
Editor’s note: Haskell’s Bryan Bedell, Vice President of Water, and Mike Hoisington, Director of Project Development...
One seemingly simple concept – processing clean water and wastewater appropriately – has complicated implications for...
The Salt Lake City Department of Public Utilities (SLCDPU) has partnered with Haskell to construct a state-of-the-art...
Assailed by the widespread effects of climate crisis, increasing demand and aging infrastructure, the stress on – and...
Water is one of Haskell’s core markets, and the growing need for infrastructure in both the public and private sectors has...
Here are three clear reasons why there has never been a better time to be a business development professional in Haskellâ€...
Regional clients, business leaders and industry professionals recently joined Haskell team members to commemorate...
Haskell is increasing its investment in Miami with the opening of a new, larger office to support rapid growth. South Florida’s...
Haskell Project Superintendent Karl Kerr likes to take a vacation after finishing a project and before starting a new one....
Working with family day in and day out may not be for everyone, but it’s never a problem for Exiquio Garcia and his sons Gustavo...
Haskell’s Water and Wastewater Division is growing in both the size and number of projects, so the company now has created...
As job descriptions go, the posting for Haskell’s Director of Project Development in the Water/Wastewater Division describes...
As she talks about the opening in Haskell’s Salt Lake City, Utah, office for a Marketing and Proposal Specialist, Judy Deshler...
Here are some fun Frankie McGee facts. Frankie was a 15-year-old grocery store bag boy when he met his future wife, Ann. She...
As a nationally respected and highly ranked contractor in the Food & Beverage and Water/Wastewater markets, Haskell...
During one of Bobby Bradley’s first days as a carpenter apprentice at Haskell, his superintendent sat him down and asked...
Engineering News-Record’s awards and lists are the gold standard in the construction industry, and as Editor-in-Chief...
These days, Sonny Carter is an experienced and accomplished project superintendent with Haskell, responsible for planning...
Tiffany Shaw grew up loving to build and fix things with her father. She never knew this love for problem solving would lead...
Fresh out of the University of Alabama with a degree in civil engineering, Brad Meadows spent the first three years of his...
JACKSONVILLE, FL – Richard Moore, Director of Construction for Haskell’s Infrastructure & Transportation...
JACKSONVILLE, FL – Haskell, one of the leading global architecture, engineering, construction (AEC) and consulting...
Owners often look to design-build delivery as a means to accelerate the overall schedule for their water or wastewater...
JACKSONVILLE, FL – Haskell, one of the industry’s leading integrated AEC firms, recently took home two Excellence...
What if the owners of municipalities could simultaneously help the environment and create a revenue stream that could...
Bryan Bedell, Division Leader of Haskell’s Water Division, takes a moment to answer five questions about key issues...
What happens when you attempt an infrastructure improvement project without full plans and specifications? For progressive...
Is it possible to make energy upgrades to your facility without being hampered by the inability to raise rates or undertake...
The Miami-Dade Commission approved $1.6 billion over the next 15 years to repair and update the county’s aging water and...
Water utilities have quickly realized the pressures of delivering quality product to consumers in a changing environment....
Although JEA had developed a preliminary design as part of the original request for proposal, they saw value in allowing...
701 San Marco Boulevard
Jacksonville, FL 32207
© 2025 Haskell. All rights reserved.
We collect basic analytics to improve your experience. No personal data is stored. By continuing to use this site, you acknowledge this. For more details, see our Privacy Policy.